Showing posts with label excavator. Show all posts
Showing posts with label excavator. Show all posts

Tuesday, July 05, 2011

The hole is dug


In extremely hot weather the hole was finally finished the excavator kept breaking down because of the heat so that held things up for awhile, anyway today the builders have arrived in force to start building the pool, again today looks like it is going to be very hot, i wouldnt like to be down that hole laying bricks i know that much.

Wednesday, June 29, 2011

Birth of the pool


Yesterday the contractors arrived to start construction of the swimming pool, all paperwork is in place so excavation begins, access is difficult so a small digger arrived and squeezed through the gap between the house and the wall, the alternative was to knock down the wall, instead there was a justchip taken out the corner of the house, Quin says 15 minutes to fix.
surprisingly the ground is mainly sand and boulders and hard work for the digging machine, temperatures are in the mid to high 30ś and the engine of the digger keeps overheating, but at least it gives the workmen a break from the intense heat. At least the excavated ground is not having to be carted away as there was lower terrace to the garden that we are infilling.

Thursday, June 18, 2009

Dredging the Segura

Rojales Rio Segura
Over the past few weeks work has been going on to remove the silt from the River running through the town, they are now working down at the basin near Rojales bridge. to do the job efficiently the river is dammed and trucks bring in dry soil which is mixed with the silt by an excavator and then put back in the trucks to be taken away, It used to get very smelly along this stretch of river so hopefully when it is finished there will not be this problem. The ducks and geese dont look very happy about it and it can only be hoped the fish have all moved upstream.